MORE pneumatic lime injection at CELSA OSTROWIEC
MORE received an order from CELSA Poland located in Ostrowiec to supply a new sidewall lime injection system for their 150 t (165 st) EBT electric arc furnace.
The steel plant in Ostrowiec manufactures long and forged products and…