X

17/04/2018

CHEMICAL ENERGY PACKAGE UPGRADE AT EMIRATES STEEL (U.A.E.)

Emirates Steel (U.A.E.) is operating SMP-1 furnace with the latest generation of chemical energy package recently upgraded with four M-ONE injectors in place of supersonic oxygen injectors and carbon lances.

SMP-1 EAF performances have improved both in terms of productivity and overall process control decreasing electric energy usage and reducing power-on time.

Results

100% Hot DRI 40% Scrap + 60% Cold DRI
Power on time – 1,3 minutes – 2,6 minutes
Electrical energy – 20 kWh /Ton – 25 kWh /Ton

 

The above results are related to SMP-1 150 tons EAF capacity; 130+20%MVA trafo, hot DRI at 400° C.

M-ONE injectors have been installed into CNC COPPER BULGED BLOCKS.

Due to the positive results achieved on SMP-1 furnace, Emirates Steel has awarded the order to upgrade the chemical energy package on SMP-2 EAF, startup expected by July 2018.

Do you want to receive more informations about our products?